Joint Statement 5 th workshop. Involvement of public & transparency of the planning process in IWWs infrastructure project. Ivan Mitrovic , Project Manager Directorate for Inland Waterways ( Plovput ), Republic of Serbia. Zagreb, 04-05 th of February 2014.
Transcript
Joint Statement5th workshopInvolvement of public &transparency of the planning process in IWWs infrastructure projectIvan Mitrovic, Project ManagerDirectorate for Inland Waterways (Plovput), Republic of SerbiaZagreb,04-05th of February 2014Project funded bythe European UnionContentProject areaApplication of JSCurrent navigation conditionsInstead of conclusionSummaryProject area01. Application of JSJS: …supporting a dynamic equilibrium and adequate connectivity conditions…
  • Adopted design approach:
  • Preserving connectivity conditions
  • 02. Application of JSJS: …undisturbed longitudinal and lateral migration of all fish species and other water-related species to ensure their natural and self-sustaining development…
  • Adopted design approach:
  • Preferring detachedstructures
  • 03. Application of JSJS: …a balanced sediment budget…
  • Adopted design approach:
  • Preserving sediment equilibrium
  • 04. Application of JSJS: …Establish interdisciplinary planning teams involving key stakeholders…
  • Stakeholders’ Forum established
  • Public participation matrixFavorable position – precondition for integrated project planningRepresentativeness of relevant stakeholdersLow HighMITROVIC Ivan, MUSKATIROVIC Jasna, CURCIC Milica, OSTOJIC BARJAKTAREVIC Zaneta, ZANETTI Roberto: Integrated project planning in inland waterway project, Smart Rivers 2013Early LateStage of the project when public participation is enabledIntegrated project planning matrixFavorable position - IntegratedprojectplanningDiversification of project objectivesLow HighMITROVIC Ivan, MUSKATIROVIC Jasna, CURCIC Milica, OSTOJIC BARJAKTAREVIC Zaneta, ZANETTI Roberto: Integrated project planning in inland waterway project, Smart Rivers 2013Low HighRepresentativeness of relevant stakeholders05. Application of JSJS: …Set-up a transparent planning process (information/ participation)…
  • Stakeholders’ Forum established
  • Web site, no restrictions(2.000hits monthly)
  • Serbian and English language
  • 9 Forum meetings
  • 2 site visits
  • 26 presentations on events
  • 24 articles
  • 1 movie
  • Stakeholders’ Forum evaluation results06. Application of JSJS: …Ensure the comparability of alternatives…
  • Multi-Criteria Analysis
  • Navigation
  • Environment
  • Technical feasibility
  • Costs
  • 07. Application of JSJS: …Inform and consult the international river commissions in the Danube River Basin…
  • Stakeholders’ Forum
  • 08. Application of JSJS: …Seek to avoid or, if this is not possible, to minimize the impacts of structural/ hydraulic engineering interventions…
  • For each of 6 sectors, at least 5 conceptual alternatives
  • For conceptual alternatives, up to 35 simulations
  • 09. Application of JSUse of best practice measures to improve navigation…
  • Using all available practice, to identify the most suitable solution for each sector, by case-by-case approach
  • 10. Application of JSJS: …Ensure flexible funding … to enable integrated planning and adaptive implementation & monitoring…11. Application of JSJS: …Monitor the effects of measures…
  • Environmental monitoring ensured: before, during and after works
  • Hydro-morphology
  • Water and sediment quality
  • Biology
  • 12. Application of JSJS: …Use a case-by-case approach…
  • Every critical sector analyzed by case-by-case approach
  • 13. Application of JSJS: …“working with nature” … following the principle of minimum or temporary engineering intervention…
  • Mostly applied solution is dredging, with refilling the sediment back into the river
  • Minimum structural interventions by application of different pilot solutions
  • All structures detached
  • 14. Application of JSJS: …Integrated design of regulation structures, equally regarding hydraulic, morphological and ecological criteria…
  • Multi-Criteria Analysis
  • Navigation
  • Environment
  • Technical feasibility
  • Costs
  • 15. Application of JSJS: …implementation of measures in an adaptive form (e.g. river bed stabilization by granulometric bed improvement, low water regulation by groynes)…
  • All structures design to have impact only during low water periods
  • 16. Application of JSJS: …Optimal use of the potential for river restoration (e.g. river banks restoration) and side channel reconnection…
  • Budget for (during monitoring programme) identified additional environmental compensation measures insured
  • 17. Application of JSJS: …Ensuring that flood water levels are not exacerbated and, ideally, are reduced…
  • No long-term impact on water levels
  • Current navigation conditionsCritical sector FUTOG – available depth, August 201219Current navigation conditionsCritical sector FUTOG – available depth, Augustand December 201319Instead of conclusion
  • Acknowledging each others
  • Respecting each others
  • Building trust
  • Asking each others
  • Listening each others
  • Understanding each others
  • Learning from each others
  • Common understanding
  • Planning together
  • Working together
  • For more infowww.plovput.rsSummaryProject areaApplication of JSCurrent navigation conditionsInstead of conclusionSummaryJoint Statement5th workshopThank youfor your kind attentionIvan Mitrovic, Project ManagerDirectorate for Inland Waterways (Plovput), Republic of SerbiaZagreb,04-05th of February 2014Project funded bythe European Union
    Recommended
    View more...
    We Need Your Support
    Thank you for visiting our website and your interest in our free products and services. We are nonprofit website to share and download documents. To the running of this website, we need your help to support us.

    Thanks to everyone for your continued support.

    No, Thanks
    SAVE OUR EARTH

    We need your sign to support Project to invent "SMART AND CONTROLLABLE REFLECTIVE BALLOONS" to cover the Sun and Save Our Earth.

    More details...

    Sign Now!

    We are very appreciated for your Prompt Action!

    x