Makerere Second year intern report with KCCA by Bamuhimbise Gilbert
Tags
Transcript
    MAKERERE UNIVERSITY COLLEGE OF ENGINEERING, DESIGN, ART AND TECHNOLOGY SCHOOL OF CIVIL AND ENVIRONMENTAL ENGINEERING SECOND YEAR INTERNSHIP REPORT FOR INDUSTRIAL TRAINING WITH KCCA FOR THE PERIOD 28 TH  MAY TO 05 TH JULY 2018 BAMUHIMBISE GILBERT Departmental Supervisor SUPERVISORS Field Supervisor Eng. Micheal Atukunda Mrs Namuyiga Irene August 2018  Second year intern report | Bamuhimbise Gilbert i DECLARATION I, BAMUHIMBISE GILBERT, hereby declare that this report, that is due for submission at the College of Engineering, design, art and Technology (CEDAT), is purely a record of srcinal work that I got involved in under the guidance of my field supervisor, Mrs Namuyiga Irene at Kampala Capital City Authority. It is being submitted for the award of the degree of Bachelor of Science in Civil and Environmental Engineering at Makerere University. To the best of my knowledge, this report has never been submitted before for any award to this institution and other institutions. NAME: ……………………………………………...   SIGNATURE: ……………………………………………...   DATE: …………………………………………….  gbamuhimbise@cedat.mak.ac.ug; bamuhimbisegilbert@gmail.com   Second year intern report | Bamuhimbise Gilbert ii ACKNOWLEDGEMENT First and foremost, I would like to extend my sincere gratitude to the management team of Kampala Capital City Authority for granting me an opportunity to train under their guidance. I am so grateful to the whole supervision team at the organisation who have been there to see that I successfully complete my internship at the organisation. In a special way, I would like to thank my Field Supervisor, Mrs Namuyiga Irene for all her efforts to see that my training could be a success. I am also grateful to Eng. Adolf Tibeyalirwa for the exposure to the tests carried out in the Laboratory about road construction materials. Special appreciation also goes to my fellow trainees at the organisation for the spirit of togetherness that they exhibited throughout the entire training period. Surely, they made me feel at home. I also extend my thanks to all the workmen, Foreman and fixers, carpenters, technicians, masons and all the labourers for being so co-operative, friendly, helpful, assistant and united with me for all the inquiries during the six weeks training with them. Last but not least, I would like to thank to my departmental supervisor, Eng. Michael Atukunda for guiding me throughout my entire training period.  Second year intern report | Bamuhimbise Gilbert iii TABLE OF CONTENTS DECLARATION ....................................................................................................................................... i   ACKNOWLEDGEMENT ...........................................................................................................................ii   LIST OF FIGURES ................................................................................................................................... vi   LIST OF TABLES ................................................................................................................................... viii   LIST OF ABBREVIATIONS ...................................................................................................................... ix   ABSTRACT.............................................................................................................................................. x   CHAPTER 1: INTRODUCTION ................................................................................................................ 1   1.1 Industrial training background .................................................................................................. 1   1.1.1 Objectives of the training ................................................................................................... 1   1.1.2 Expected benefits from the Field attachment program ..................................................... 2   1.2 Project Background .................................................................................................................... 3   1.3 KAMPALA CAPITAL CITY AUTHORITY (KCCA) ............................................................................. 3   CHAPTER 2: LITERATURE REVIEW ........................................................................................................ 6   2.1 ROAD CONSTRUCTION (CATEGORY ONE): ................................................................................. 6   2.1.1 Bush clearing and grubbing ................................................................................................ 6   2.1.2 Excavation process .............................................................................................................. 7   2.1.3 Pavement construction ....................................................................................................... 8   2.2 DRAINAGE (CATEGORY TWO): ................................................................................................. 15   2.2.1 Roadside drainage (open channels) ................................................................................. 15   2.2.2 Cross drainage .................................................................................................................. 16   2.3 SURVEY WORKS (CATEGORY THREE): ...................................................................................... 18   2.3.1 Reconnaissance surveys ................................................................................................... 18   2.3.2 Preliminary Survey: ........................................................................................................... 19    Second year intern report | Bamuhimbise Gilbert iv 2.3.3 Final survey ....................................................................................................................... 19   2.4 MATERIALS (CATEGORY FOUR): ............................................................................................... 20   2.4.1 Concrete:........................................................................................................................... 20   CHAPTER 3: PRACTICAL WORK .......................................................................................................... 25   3.1 ROAD CONSTRUCTION (CATEGORY ONE): ............................................................................... 25   3.1.1 Subgrade: .......................................................................................................................... 25   3.1.2 Subbase: ............................................................................................................................ 27   3.1.3 Base: .................................................................................................................................. 28   3.1.4 Sand Cone Replacement Test for Pavement layers: ......................................................... 29   3.1.5 Wearing Course (Asphalt) ................................................................................................. 34   3.1.6 Traffic Count: .................................................................................................................... 38   3.2 DRAINAGE (CATEGORY TWO): ................................................................................................. 39   3.2.1 Culvert Installation: ........................................................................................................... 39   3.2.2 Cross Drain Culverts (at 0+346 and 0+300): ..................................................................... 41   3.2.3 Headwall and Apron: ........................................................................................................ 41   3.3 SURVEY WORKS (CATEGORY THREE): ...................................................................................... 43   3.3.1 Survey Instruments ........................................................................................................... 43   3.3.2 Monitoring the layer levels ............................................................................................... 43   3.3.3 Procedure for monitoring levelling of the layers ............................................................. 44   3.4 MATERIALS (CATEGORY FOUR): ............................................................................................... 45   3.4.1 Concrete:........................................................................................................................... 45   3.5 SUMMARY OF WEEKLY ACTIVITIES .......................................................................................... 48   CHAPTER 4: OBSERVATIONS, CHALLENGES, RECOMMENDATIONS AND CONCLUSIONS ................. 55   4.1 Observations ............................................................................................................................ 55  
Recommended
View more...
We Need Your Support
Thank you for visiting our website and your interest in our free products and services. We are nonprofit website to share and download documents. To the running of this website, we need your help to support us.

Thanks to everyone for your continued support.

No, Thanks
SAVE OUR EARTH

We need your sign to support Project to invent "SMART AND CONTROLLABLE REFLECTIVE BALLOONS" to cover the Sun and Save Our Earth.

More details...

Sign Now!

We are very appreciated for your Prompt Action!

x